Post

1 follower Follow
0
Avatar

Time tracking tasks displayed different depending on who is signed-on

When I sign-in as the resource assigned to tasks I get more tasks (some are scheduled into the future)  then I do if I sign-in as myself and select the resource for time tracking.  See attached.  Why is this? 

Bryan Mumma Answered

Please sign in to leave a comment.

1 comment

0
Avatar

Hi Brian

I just noticed the timelines are not identical in both instances  - one is Aug 13 and the other is Aug 14.

If you align them, does it resolve the issue for you?

Diana Sandura 0 votes
Comment actions Permalink