How To Reference A Resource State On A New Work Item In A Workflow Rule

To prevent our configurations from automatically erroring out, I am trying to adjust our workflow rule called "Move Timesheet" to check if a resource is inactive on the work item I am trying to move a Time Entry to. However, I do not see a way to do this.

 

The way the rule works is: User marks a time entry as needing to be moved. They select the destination work item here. Then, there is another CA to actually move the timesheet. Is there a way I can check in the evaluation criteria if the time reporter on the destination work item is marked as inactive on a task? I am able to check this easily on the Work Item the Time Entry is being moved FROM, but am unable to figure out how to check the resource state on the work item we are trying to move the Time Entry TO.

Zachary Nolen