Post
FollowEnable "Direct Manager" to have permissions for their reports
As a direct report, I want to be able to help manage my reports.
If necessary, I'd like the option to:
- Add them to a project
- Assign them timesheets
- Manage their project items (all changes should create a log)
Please sign in to leave a comment.