FollowExtend out resource planning export to more than 52 days
I would like the resource planning view to cover the next 3 months by day when downloaded but when I try to download this view, I do not get all of this range in the excel. I have set the viewed date range to 52 days which is the maximum number of days allowed.
Next, when I try to export the data and select my desired range in the data picker tab, I do not get the values over the inputted range but instead only get values for the next 52 days from the start date.
I would like the export to extend the range downloaded, in the by day view, to whatever is chosen in the date picker.
For future reference, the feature request ID is CR-391759.