Post

2 followers Follow
0
Avatar

"Billing Rate per hour used in this item" field in Timesheet entity

When did the Timesheet entity fields "Billing Rate per hour used in this item" and "Cost Rate per hour used in this item" first appear in Clarizen, and do they reflect the overridden cost/billing values as per the hierarchy of overrides (discussed here: http://usermanual.clarizen.com/setting-up-project-specific-rates-prices)?

Lance Luvaul Answered

Please sign in to leave a comment.

3 comments

0
Avatar

They should reflect over-rides, not sure exactly when they were introduced.

Josh Santos 0 votes
Comment actions Permalink
0
Avatar

Thanks Josh.  I did some tests and confirmed that too. I was also hoping that once populated, those fields would never change, but that wasn't the case in my tests.  Is it possible to prevent future cost/billing rate changes (anywhere in the hierarchy) from updating those fields once populated?

Lance Luvaul 0 votes
Comment actions Permalink
0
Avatar

I don't believe you can do that with this specific field

Josh Santos 0 votes
Comment actions Permalink