Post

1 follower Follow
0
Avatar

Help with Set Evaluation Criteria

Is there a better way to set this Set Evaluation Criteria? This should be calculating 30 days from the Assigned Release Date. Thank you. (DateAdd($C_AssignedReleaseDate,Days(30)) <= Today())

Nancy Notarangelo

Please sign in to leave a comment.