Post

2 followers Follow
0
Avatar

Changing a project from draft to active

How do I change my project from draft to active?

Eileen Fallon Answered

Please sign in to leave a comment.

3 comments

0
Avatar

2 options, you can use "Mark As" from the toolbar or you can click the project icon in the Work Plan and change it from there.

Josh Santos 0 votes
Comment actions Permalink
0
Avatar

Hello - forgive ; I must be missing something. I have the same issue (currently) and I can't see the "Mark As" from the Toolbar?

Steve C Hurst 0 votes
Comment actions Permalink
0
Avatar

Steve, 

If you are looking at a Project Workplan, you should see a ribbon toolbar at the top of it where all of your shortcuts are. Under Common, you should see "Mark As". If you are looking in the right place and it is not there, it is possible to remove this from a users view using Profiles. Please verify with your Clarizen Administrator to see if you were given a profile that does not allow access to the Mark As. You can also right click on the icon near the work item name (drop down contextual menu) and should be able to do it from there as well. 

If Profiles is not the scenario, please open a case and work with us in Support to resolve this for you.

 

Boris Krutiy 0 votes
Comment actions Permalink