I would put project 1 and 2 in a master project, and instead of using the report generator either share the view or export it to Excel (from within the master project).
Comment actions
My structure is this:
Project1 is composed of SubprojectA, SubprojectB, SubprojectC
Project2 is composed of SubprojectA, SubprojectB, SubprojectC
So looking at a list of subprojects in the report generator, I cannot tell which subprojects go with with projects since the subproject names are the same.
What do I need? A report for Project1 and all of its subprojects; a separate report for Project2 and all of its subprojects.
Can I do this?
Thank you.
Please sign in to leave a comment.
I would put project 1 and 2 in a master project, and instead of using the report generator either share the view or export it to Excel (from within the master project).