Time reporting facility at milestone level for specific projects

If there a way to set a parameter at the project level to enable Time reporting facility  at milestone level .

 

Even though in system settings the "Include leaf milestones and projects in time-sheets" is set to 'OFF'

Ophira Moses Answered

Please sign in to leave a comment.

1 comment

0
Avatar

Hi Ophira,

Is the milestone a sub work item of the project? In regards to having this setting off, you would want this to be on if the milestone is a sub item of the project.