[CR-490] Work-by-day

Ability to set resource schedules on a daily basis (estimated work by day), estimate resource load by day.

Permanently deleted user Planned

Please sign in to leave a comment.

5 comments

0
Avatar

Hi Vanessa,

When will work by day be officially released into production?

Thanks,
Chad

Chad Williams 0 votes
Comment actions Permalink
0
Avatar

I'd also an estimated release date for this feature. Our projects often consist of tasks long in duration as compared to work. Without this feature managing allocation is difficult and requires artificially breaking down the work.

Joseph Kerby 0 votes
Comment actions Permalink
0
Avatar

It is already available for testing if you have a Sandbox account (it just needs to be enabled in Clarizen Labs). It should be ready for production accounts during our Summer release, which is less than a couple months away.

Josh Santos 0 votes
Comment actions Permalink
0
Avatar

Thanks for the update, Josh. I do not currently have a sandbox account. How do I go about requesting one? 

Joseph Kerby 0 votes
Comment actions Permalink
0
Avatar

You would have to talk to your Account Executive as there is an additional fee for the Sandbox (it is also included in our Elite Success Plan)..

Josh Santos 0 votes