I am new to Clarizen reports and am having trouble creating a very basic report.

We have several projects which are of the same type. I am trying to create a report which shows them all on a stacked graph.

I would like to have each stacked graph to be the project name while stacking the status of that project and indicating the percent complete. So one stack would show the label "Project A" then stack the status of On Track, At Risk and Off Track as a percent of the whole. So if there are 50% On Track, 25% At Risk and 25% Off Track, that is how it would stack them to total the 100%.

Not sure of this makes sense, but i cannot seem to it show by "% Complete" field.

 

Umesh Shah Answered