Post

3 followers Follow
0
Avatar

Daily Progress Updates in Clarizen

I am looking to develop a process where a resource will make daily changes to the property card and tasks within a WBS. Is there any way to archive the changes that are made to the property card and WBS on a daily basis in Clarizen? The changes will be made every single day. 

Please let me know if you need more details. 

 

Colin Knoll Answered

Please sign in to leave a comment.

4 comments

0
Avatar

This is possible to do with configuration. We have an app called Stay Tuned that can be modified to track changes with custom fields, but you would have to configure this with your PS Consultant.

Josh Santos 0 votes
Comment actions Permalink
0
Avatar

We now have a full Change History (Audit Trail), which is built right into the system. You will see it in System Setting or your toolbar in a specific Project under Utilities.

Josh Santos 0 votes
Comment actions Permalink
0
Avatar

I don't see where the change history tracks changes to fields in the Project Property Card, am I missing something?

Kristin Rohrer 0 votes
Comment actions Permalink