Post

2 followers Follow
0
Avatar

Resource Load - Assigned Actual Effort roll up at the resource level / project level

In the resource load, we would like to have Assigned Actual Effort rolled up at the resource level/project level. For future reference, the feature request ID is CR-657058.

Diana Sandura Not planned

Please sign in to leave a comment.