Have the ability to embed a Clarizen Report within Slide Publisher, and have the ability to pass in the runtime filters (such as Project, Program etc.)

For example we can create a report within Clarizen for example a Risk Heat Map, as part of the report it has a run-time filter which prompts for the Project (to apply against the heat-map)

Would be good to embed this within the Project Reporting that is created with Slide Publisher, so that it can be passed across as a parameter when the report is embedded.

Currently I believe reports can only be embedded that don't have runtime filters?