This report currently does not exist, but it would be possible to do with the Excel add-in and pivot tables.
Please sign in to leave a comment.
This report currently does not exist, but it would be possible to do with the Excel add-in and pivot tables.
Actually I take that back, I forgot about the new Project Utilization report. Please try that one and let us know if it will work (thanks for the catch David G.)
The project utilization report is not efficient for this purposes. I have a few select users that I need all the time they've booked towards all the projects they are assigned to. In this case it's between 20-30 projects. To set this up with the project utilization query builder is time consuming and you loose track of which projects you've selected. It would be easier if the total weekly report hours by selected user project was modified to pull all projects that the selected users decked time against.